Result for 4 item(s)

No Wait-On-Cement (NO WOC) Successfully Applied in Pertamina Hulu Mahakam (PHM) and Creating Significant Well Rig Time Saving

Proceedings Title : Proceedings, Indonesian Petroleum Association, Digital Technical Conference, 14-17 September 2020

As the new operator of the Mahakam Block started in 2017, Pertamina Hulu Mahakam (PHM) were challenged to ramp up operations in order to combat massiv...

Read More

Log In as an IPA Member to Download Publication for Free.

Under Rig Floor Offline Tubingless Cementing in Swamp Drilling Rigs Mahakam Delta

Proceedings Title : Proc. Indon. Petrol. Assoc., 43rd Ann. Conv., 2019

Mahakam delta is developed with industrialized drilling activities with Swamp Barge Rigs. The main challenge is wells with low incremental reserves, e...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

Improved Primary Cementing Design as Mitigation to Post-Cementing Gas Migration

Proceedings Title : Proc. Indon. Petrol. Assoc., 43rd Ann. Conv., 2019

Hydrocarbon migration after cementing is a troublesome issue which is usually faced during well construction process. The problem will be more complic...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

The First Successful Rigless Monotrip Gas Lift Completion in Mahakam Field

Proceedings Title : PROCEEDINGS, INDONESIAN PETROLEUM ASSOCIATION, Forty-Fifth Annual Convention & Exhibition, 1 - 3 September 2021

Pertamina Hulu Mahakam (PHM) has applied the Mono Trip Gas Lift (MTGL) completion technique with 27 wells that have been completed by drilling rigs. T...

Read More

Log In as an IPA Member to Download Publication for Free.