Peciko field development - phase 4 HP platforms and MP compression

Proceedings Title : Proc. Indon. Petrol. Assoc., 29th Ann. Conv., 2003

This paper outlines the main purpose of the new production facilities to be installed in the Peciko field during Phase 4 of the fields development.The basic objective of this development is to be able to:1. Maintain Peciko delivery capacity above 1250 MMSCFD2. Maintain and Improve the export reliability:· Develop Medium Pressure (MP) Gas production facilities.· Increase the offshore gathering network flexibility3. Support the significant increase of gas demand over 2001-2004To meet the above objectives, the scope of the Peciko Phase 4 Project includes:· Addition of two new Satellite Wellhead Platform (SWP) SWP-E and SWP-K in 2003 for High Pressure (HP) production.· Addition of two new trunk lines between the field and the onshore facilities to provide sufficient export capacity for HP and MP production.· Addition of new infield sub-sea pipe-lines to provide a flexible offshore gathering network.· Addition of two compression trains, each with a 450 MMSCFD nominal capacity, onshore at Peciko Process Area (PPA) to lower Wellhead Flowing Pressure (WHFP) of the weakest wells.

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.