The use of production logging surveys to determine the injection profile at the Kenali Asam waterflood pilot project
Year: 1992
Proceedings Title : Proc. Indon. Petrol. Assoc., 21st Ann. Conv., 1992
This paper discusses the use of Production Logging to determine the injection profile in the Kenali Asam Waterflood Pilot Project water injection wells. The result of surveys at three of four water injectors showed that the injection profile at the injection zories was not uniform due to reservoir rock characteristics, plugging ot the perforated interval or poor cement bond.Production Logging Interpretations for this paper will be limited to the evaluation of water entry to the injection zone.
Log In as an IPA Member to Download
Publication for Free.
or
Purchase from AAPG Datapages.