Work study application for management information on wax plant operation for the possibility of increasing the ready-wax production
Year: 1973
Proceedings Title : Proc. Indon. Petrol. Assoc., 2nd Ann. Conv., 1973
The main objective of this study was made to give the necessary informations to management, regarding the possibility to increase Balikpapan wax production from 110 mton/day to 140 mton/day, applying all the existing processing equipments and work program.About mid 1971, a work study or work measurement was carried out at Balikpapan Waxplant, to observe to what extent the ideal maximum capacity can be reached of the following various sections: - Dewaxing section, - Sweating section, - Treating section, - Moulding and Packaging section.Those various sections are interdependent to each other, and separate batch wise operations are incurred to each section where the endurance or processing period plays an important role.Although individual section design capacity is known, the sections capacity summing cannot be applied. However, to obtain the overall feasible and operatable maximum capacity of Balikpapan Waxplant, with the existing processing equipments, and to know the available spare wax production capacity, a general work study and work measurement to the equipment operation was applied.
Log In as an IPA Member to Download
Publication for Free.
or
Purchase from AAPG Datapages.