Completion Management System for Smooth Project Commissioning and Start-up
Year: 2019
Proceedings Title : Proc. Indon. Petrol. Assoc., 43rd Ann. Conv., 2019
Commissioning and startup are a critical phase in the project execution, that needs to be managed properly. A completion management system (CMS) was developed in ConocoPhillips (Grissik) Ltd. to ensure smooth and timely project commissioning and start up in accordance with the project plan. It is a project completion solution as a monitoring tool to track, control & comply documentation related to inspection test plan (by discipline and by sub-system) to support readiness for mechanical completion, pre-commissioning, commissioning & handover of equipment facilities to operations. Other than that, this system also ensures a consistent set of information across project locations based on closing inspection test record (ITR) This poster will elaborate on how the CMS is implemented in the project and how the system has driven the efficiency and work quality of the project completion. The process, workflow, and how the system administration is managed to achieve the project objectives, will also be presented.
Log In as an IPA Member to Download
Publication for Free.
or
Purchase from AAPG Datapages.