Result for 26 item(s)

Probabilistic Technique to Estimate Duration of Rig-Less Gravel Pack Completion for a Better Planning

Proceedings Title : Proc. Indon. Petrol. Assoc., 46th Ann. Conv., 2022

The operator has been utilizing a hydraulic workover unit to perform gravel pack completion in its offshore fields since 2019. Managing all fleets in...

Read More

Log In as an IPA Member to Download Publication for Free.

Technical Initiatives and Cost-Effectiveness to Optimize The Drilling Project of The Jambaran Sour Gas Field Development

Proceedings Title : Proc. Indon. Petrol. Assoc., 46th Ann. Conv., 2022

The Jambaran structure is a gas field located in East Java, Indonesia. From 2019-2021 the development project has been carried out by drilling five ne...

Read More

Log In as an IPA Member to Download Publication for Free.

Combining Gas Lock Prevention Module, Electric Submersible Pump, and Selective Perforation Strategy to Overcome Gas Production on Key Outstep Well in Depleted Conglomerate Oil Reservoir

Proceedings Title : Proc. Indon. Petrol. Assoc., 46th Ann. Conv., 2022

C field has been produced for more than 30 years, mainly from the conglomerate layer as the main oil layer producer. This main layer in the existing a...

Read More

Log In as an IPA Member to Download Publication for Free.

Implementation of Unique Eccentric Reamer Tool to Improve Pull Out of Hole Time and Casing Running Through Borehole Conditioning: A Case Study in Onshore Drilling West Java, Indonesia

Proceedings Title : Proc. Indon. Petrol. Assoc., 46th Ann. Conv., 2022

Advances in drilling equipment, drill bit design and PDC cutter technology have resulted in significant time savings through increases in penetration...

Read More

Log In as an IPA Member to Download Publication for Free.

Rig Hours Optimization Using Plug Modification on Fracturing Job in Sangasanga Field

Proceedings Title : Proc. Indon. Petrol. Assoc., 46th Ann. Conv., 2022

Sangasanga Field is one of 22 fields in PT. Pertamina EP with oil production target of 5670 BOPD in 2019. The Field well work plan includes 32 wells w...

Read More

Log In as an IPA Member to Download Publication for Free.

Application of Relative Permeability Modifier for Fluid Loss Control During TCP Shoot & Pull to Improve Rig Efficiency - Offshore Indonesia

Proceedings Title : Proc. Indon. Petrol. Assoc., 46th Ann. Conv., 2022

Five wells were drilled to produce gas from a sandstone formation with gross intervals of 314-696 ft. The operator required underbalanced perforating...

Read More

Log In as an IPA Member to Download Publication for Free.

The First Successful Installation of Metal-to-Metal, Gas-Tight Casing Reconnect System to Reinstate Exploration Well to Production

Proceedings Title : Proc. Indon. Petrol. Assoc., 46th Ann. Conv., 2022

The S-3 and S-4 exploration wells in S Field in indonesia, were drilled in 2015 and 2016, respectively, and subsequently permanently plugged and aband...

Read More

Log In as an IPA Member to Download Publication for Free.

Well servicing by pump down techniques

Proceedings Title : Proc. Indon. Petrol. Assoc., 3rd Ann. Conv., 1974

A number of wells have been completed for and have been serviced by pump down techniques. The services performed with this first generation hardware i...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

Annulus Cementing with Coil Tubing Packer Methods with Case Study on Sisi Nubi Field

Proceedings Title : Proceedings, Indonesian Petroleum Association, Digital Technical Conference, 14-17 September 2020

PHM fields are located in The Mahakam Delta and Offshore area in East Kalimantan, Indonesia. Most of the wells are multizone gas producers completed w...

Read More

Log In as an IPA Member to Download Publication for Free.

Multi Zone Single Trip Gravel Pack System Deployed on Hydraulic Workover Unit: Holistic Approach to Optimize Drilling and Completion Cost in the Mahakam Delta

Proceedings Title : Proceedings, Indonesian Petroleum Association, Digital Technical Conference, 14-17 September 2020

The Multi Zone Single Trip Gravel Pack (MZSTGP) system has been proven as the main solution for developing shallow reservoirs and overcoming sand prod...

Read More

Log In as an IPA Member to Download Publication for Free.

Achieving Operational Excellence for Gas Lift Modeling in High Angle Wells with Multidisiplinary Approach

Proceedings Title : Proceedings, Indonesian Petroleum Association, Digital Technical Conference, 14-17 September 2020

High angle wells are compulsory in offshore fields. These types of wells require better understanding on flow assurance dynamics and better planning o...

Read More

Log In as an IPA Member to Download Publication for Free.

Success Story of Single-Job Multiple Zones Chemical Sand Consolidation in Mahakam Delta

Proceedings Title : Proceedings, Indonesian Petroleum Association, Digital Technical Conference, 14-17 September 2020

Multiple zones chemical sand consolidation jobs are often avoided because of low success ratio. Strict operational and technical limitations must be r...

Read More

Log In as an IPA Member to Download Publication for Free.

HPHT Zonal Isolation and Triple Tubular Perforation: A Success Story of Re-Accessing Old Reservoir Without Recompletion with Rig

Proceedings Title : Proceedings, Indonesian Petroleum Association, Digital Technical Conference, 14-17 September 2020

The Natuna sea area is known to have many comprehensive geological profiles and is also known as a big contributor for petroleum exploration. The West...

Read More

Log In as an IPA Member to Download Publication for Free.

Banyu Urip Upper Perforation Shut-off: A Success Story of Hydroformed Expandable Casing Patch Installation to Reduce GOR and Maximize Oil Production

Proceedings Title : Proceedings, Indonesian Petroleum Association, Digital Technical Conference, 14-17 September 2020

ExxonMobil Cepu Limited (EMCL), as the operator of Banyu Urip field in Cepu Block, Indonesia, observed several oil wells with high Gas Oil Ratio (GOR)...

Read More

Log In as an IPA Member to Download Publication for Free.

Under Rig Floor Offline Tubingless Cementing in Swamp Drilling Rigs Mahakam Delta

Proceedings Title : Proc. Indon. Petrol. Assoc., 43rd Ann. Conv., 2019

Mahakam delta is developed with industrialized drilling activities with Swamp Barge Rigs. The main challenge is wells with low incremental reserves, e...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

Improved Primary Cementing Design as Mitigation to Post-Cementing Gas Migration

Proceedings Title : Proc. Indon. Petrol. Assoc., 43rd Ann. Conv., 2019

Hydrocarbon migration after cementing is a troublesome issue which is usually faced during well construction process. The problem will be more complic...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

Hammering Tool Application for Shifting Open Formation Isolation Valve Seated in the Hi-angle Subsea Well in Offshore Bali - Indonesia

Proceedings Title : Proc. Indon. Petrol. Assoc., 43rd Ann. Conv., 2019

Development drilling campaign was conducted in 2018 at Bali Offshore by Kangean Energy Indonesia (KEI). 3 Horizontal wells and 1 deviated well were dr...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.

Case History of Matrix Acid Stimulation using Specialized Acid Composition for High Temperature Carbonate Formation and Long Interval Section

Proceedings Title : PROCEEDINGS, INDONESIAN PETROLEUM ASSOCIATION, Forty-Fifth Annual Convention & Exhibition, 1 - 3 September 2021

Alur Siwah field is located onshore in Block A PSC of PT Medco E&P Malaka, Aceh Province. Six of the ten drilled wells proved significant gas column i...

Read More

Log In as an IPA Member to Download Publication for Free.

Shallow Water Subsea Well Drilling and Completion Utilizing Jack Up Rig at Natuna Sea Block

Proceedings Title : PROCEEDINGS, INDONESIAN PETROLEUM ASSOCIATION, Forty-Fifth Annual Convention & Exhibition, 1 - 3 September 2021

In 2019, Premier Oil Indonesia commenced drilling campaign to complete 4 development wells consist of 3 subsea development wells and 1 platform well a...

Read More

Log In as an IPA Member to Download Publication for Free.

The First Successful Rigless Monotrip Gas Lift Completion in Mahakam Field

Proceedings Title : PROCEEDINGS, INDONESIAN PETROLEUM ASSOCIATION, Forty-Fifth Annual Convention & Exhibition, 1 - 3 September 2021

Pertamina Hulu Mahakam (PHM) has applied the Mono Trip Gas Lift (MTGL) completion technique with 27 wells that have been completed by drilling rigs. T...

Read More

Log In as an IPA Member to Download Publication for Free.

First Application Micro Coiled Tubing in Indonesia it Offshore Mahakam

Proceedings Title : PROCEEDINGS, INDONESIAN PETROLEUM ASSOCIATION, Forty-Fifth Annual Convention & Exhibition, 1 - 3 September 2021

With a view to addressing the challenges of future offshore platform evolution, smaller footprint of coiled tubing set is required for pumping work i...

Read More

Log In as an IPA Member to Download Publication for Free.

Development and Improvement of Organic Salt Solutions of Potassium Citrate As An Environmentally Friendly Completion Fluids for Oil and Gas Wells

Proceedings Title : PROCEEDINGS, INDONESIAN PETROLEUM ASSOCIATION, Forty-Fifth Annual Convention & Exhibition, 1 - 3 September 2021

This article provides information on the utilization and development of colloidal formulations based on organic potassium citrate, an alternative, env...

Read More

Log In as an IPA Member to Download Publication for Free.

Draining The Last Challenging Shallow Resources By Redefining and Optimizing Barrier System in Deep Zone Wells

Proceedings Title : Proc. Indon. Petrol. Assoc., 46th Ann. Conv., 2022

The most optimum way to combat production decline is to open all possible reservoirs from existing wells. The same-layer reservoirs had been produced...

Read More

Log In as an IPA Member to Download Publication for Free.

Improving Bunyu Field Drilling Performance with Comprehensive Wellbore Stability Maintenance Strategy and Optimized Drilling Practices

Proceedings Title : Proc. Indon. Petrol. Assoc., 47th Ann. Conv., 2023

The BP2-18 well in Bunyu was successfully drilled to 8-1/2” hole section well TD at 2681 m MD in 15.3 days and successfully cemented with a 7&rd...

Read More

Log In as an IPA Member to Download Publication for Free.

Where to perforate? Where to fracture? – workflow to select and rank intervals for completion

Proceedings Title : Proc. Indon. Petrol. Assoc., 47th Ann. Conv., 2023

This paper comprehensively describes the workflow and best practices for the selection of completion intervals in a well using 1D analysis to answer t...

Read More

Log In as an IPA Member to Download Publication for Free.

Single trip multi-zone gravel-packing - a case study - Total E&P Indonesie - on Handil, Bekapai, Sisi and Nubi Fields

Proceedings Title : Proc. Indon. Petrol. Assoc., 32nd Ann. Conv., 2008

Cased Hole Sand Control techniques have been applied in Indonesian fields for many years using simple stacked gravel-packs. While comporting limited t...

Read More

Log In as an IPA Member to Download Publication for Free.
or
Purchase from AAPG Datapages.