Proceedings Title : Proc. Indon. Petrol. Assoc., 46th Ann. Conv., 2022
An energy operator in Indonesia planned an exploration well that required two divergent hole opening sections: A 12 ¼” x 13 ½&rdqu...
Read MoreLog In as an IPA Member to Download Publication for Free.
Proceedings Title : Proc. Indon. Petrol. Assoc., 43rd Ann. Conv., 2019
Activities during drilling and workover operations are reported regularly by field personnel in the Drilling Reports. Drilling reports contain a lot o...
Read More
Log In as an IPA Member to Download
Publication for Free.
or
Purchase from AAPG Datapages.
Proceedings Title : Proc. Indon. Petrol. Assoc., 43rd Ann. Conv., 2019
Plug and Abandon (P&A) is one of the most important steps of well reconditioning before production phase is halted semi permanently or ceased permanen...
Read More
Log In as an IPA Member to Download
Publication for Free.
or
Purchase from AAPG Datapages.
Proceedings Title : Proc. Indon. Petrol. Assoc., 46th Ann. Conv., 2022
The Water-Based Mud (WBM) system was planned to be used in drilling at Offshore North Madura, Indonesia. However, a review of offset wells found they...
Read MoreLog In as an IPA Member to Download Publication for Free.
Proceedings Title : Proc. Indon. Petrol. Assoc., 47th Ann. Conv., 2023
The well target was originally planned to be drilled from a new well slot, but a reassessment concluded to use an existing well slot for re-drill opti...
Read MoreLog In as an IPA Member to Download Publication for Free.
Proceedings Title : Proc. Indon. Petrol. Assoc., 47th Ann. Conv., 2023
The BP2-18 well in Bunyu was successfully drilled to 8-1/2” hole section well TD at 2681 m MD in 15.3 days and successfully cemented with a 7&rd...
Read MoreLog In as an IPA Member to Download Publication for Free.