The N'Kossa floating concrete production storage barge - Abstract
Year: 1995
Proceedings Title : Proc. Indon. Petrol. Assoc., 24th Ann. Conv., 1995
A contract for design and construction of a concrete production storage barge was awarded by Elf Congo to Bouygues Offshore on 18 August 1993. The international bid tender specified a steel hull barge, however, bidders were allowed to propose an alternative design of concrete. In this case, it was possible to show that a concrete hull for the production storage barge (FSO or FPSO) was cost competitive with a steel storage barge.
Log In as an IPA Member to Download
Publication for Free.
or
Purchase from AAPG Datapages.